What are the main tasks of the installation of CNC machining center machine tools

Jun 09, 2024 Leave a message

1. The basic construction of the CNC machining center machine tool and the CNC machining center machine tool are in place

Before the machine tool arrives, the user unit of the CNC machining center should do a good job of the machine tool foundation according to the machine tool foundation drawing, and make a reserved hole in the position of installing the anchor bolt in accordance with the parameter standards of the CNC machining center machine tool. After the CNC machining center machine arrives, unpack near the foundation, carefully count the technical documents and packing list configured by the CNC machining center manufacturer, and count the random parts and tools according to the packing list. Install according to the provisions of the machine tool manual, place a plurality of horns on the foundation to adjust the level of the machine tool, hoist the basic parts of the machine tool in place on the foundation, and put the anchor bolts into the reserved hole as required.

2. Connection and assembly of CNC machining center machine tools

The connection assembly of CNC machining center machine tools refers to the process of reassembling the scattered machine tool parts into a complete machine. Remove the anti-rust coating on the connecting surface, guide rail and each moving surface, clean the outer surface of each component, and then connect and assemble the cleaned parts into a complete machine. After assembling the machine tool parts of the CNC machining center, it is necessary to correctly connect the cables, oil pipes and gas pipes according to the electrical wiring diagram, hydraulic wiring diagram, air circuit diagram and wiring marks attached to the machine tool, and check whether the connection parts are loose and damaged, especially pay attention to the reliability and sealing of the contact, and prevent foreign objects from entering the oil pipe and gas pipe. After the cable, oil pipe and gas pipe are connected, the pipeline should be fixed in place to ensure that everything is normal before commissioning.

3. CNC machining center machine tool power-on test adjustment

CNC machining center machine tool power-on test adjustment includes machine tool power-on test run and coarse adjustment of the main geometric accuracy of the machine tool, the purpose of which is to assess whether the machine tool is installed steadily, and whether the transmission, control, lubrication, hydraulic and pneumatic systems are working normally.